Testing and documentation
Tier 1 loss + Tier 2 bidirectional OTDR on every strand, plus a GPS-tagged as-built showing pathway, splice case locations, pull-box positions, and depth. Delivered as bound PDF plus geodata for GIS import.

Commercial outside plant fiber for Burbank businesses. Licensed C-10 / C-7. Fluke-certified. Free local site survey.
Burbank businesses run on the cable plant behind the wall. Access Cabling designs and installs Outside Plant Fiber for offices, warehouses, medical suites, and technology tenants across the city — engineered, tested, and documented for the long run. Burbank, as a pivotal hub of entertainment and media within Los Angeles County, demands robust and reliable network infrastructure. From the large studio lots near Warner Bros. Outside-plant (OSP) fiber installation across California — building-to-building campus links, city-block extensions, aerial spans, direct-bury, and conduit runs. Access Cabling designs the pathway, pulls armored and loose-tube cable, installs splice cases at building entries and mid-span, and delivers full Tier 1/Tier 2 certification.
Tier 1 loss + Tier 2 bidirectional OTDR on every strand, plus a GPS-tagged as-built showing pathway, splice case locations, pull-box positions, and depth. Delivered as bound PDF plus geodata for GIS import.
Across Burbank — from Warner Bros to the surrounding Los Angeles County corridor — IT directors and facilities managers pick Access Cabling for the same reasons: a licensed C-10 / C-7 contractor (CSLB 992009), 28+ years of commercial fiber experience, BICSI-trained crews on-site, and Fluke DSX certification on every port. The result is a outside plant fiber install that a network engineer can drop into on day one — labeled, tested, and warranted for 25 years.
The essence of Burbank's creative industries – from animation studios to film editing houses and gaming developers – lies in collaborative, data-intensive workflows. This demands a multi-faceted network infrastructure beyond basic connectivity. Access Cabling provides comprehensive solutions that include not only high-speed data cabling but also specialized audio-visual (AV) cabling for intricate conference rooms, sound mixing suites, and presentation spaces. We deploy advanced Wi-Fi 6/6E solutions to support mobile production teams and guest access across facilities without compromising security or performance. Furthermore, our installations often incorporate Power over Ethernet (PoE) for IP-based security cameras, access control systems, and smart building technologies, creating a truly integrated and efficient workspace. By designing and implementing a cohesive cabling ecosystem, we empower Burbank's creative professionals to collaborate seamlessly, manage massive data sets, and bring their visionary projects to life with unparalleled technological support throughout the Media District and creative corridors.
OSP cable is loose-tube gel-filled or dry-block, jacketed for UV and moisture, and often armored (corrugated steel tape) for direct-bury and rodent protection. Aerial cables use dielectric self-support (ADSS) or figure-8 messenger construction. For inside-outside runs we specify indoor/outdoor rated cable that transitions from OFNR at the building entry without a splice — code allows 50 feet of OSP jacket inside a building before splice-to-inside-plant is required (NEC 770.48).
Common project types we deliver near Warner Bros and throughout Los Angeles County.
Absolutely. Night, weekend, and phased cutover windows are standard on Burbank tenant improvements, hospital environments, retail cores, and 24-hour operations across Los Angeles County. We run swing shifts, dark-window pulls, and cutovers scheduled around production without inflating the price.
Yes. As a certified installer for Panduit, CommScope, Leviton, and Belden, Burbank and Los Angeles projects can be registered for a 25-year performance and applications warranty on structured cabling components — copper and fiber, patch panels through work-area outlet. Coverage details are documented in the closeout package.
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small Burbank tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger Los Angeles County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
Yes. Many of our Burbank-based clients scale Outside Plant Fiber to additional sites across California and nationally. A single PM standardizes drawings, materials, testing thresholds, and closeout format across every location, so IT sees identical documentation whether the site is in Burbank or Chicago.
For short direct-bury runs on private property we self-perform. For boring, longer trenching, right-of-way work, and any complex civil scope we partner with licensed underground contractors. Either way, Access Cabling is the single point of accountability.
Typical direct-bury is 30-36 inches with a warning tape 12-18 inches above the cable. Deeper under roadways and driveways (48 inches under trafficked areas). Local code and the AHJ may specify further requirements.
Yes, Access Cabling is experienced and equipped to handle prevailing wage and public works projects within the City of Burbank and Los Angeles County. As a fully licensed and insured C-10/C-7 contractor, we are familiar with all relevant state and local requirements, including certified payroll, bonding, and compliance with California Labor Code standards. Our administrative team is proficient in managing the specific documentation and reporting protocols mandated for these types of government or publicly funded commercial infrastructure projects.
28 years, thousands of sites, one accountable contractor. Get a free site survey and an itemized quote in 48 hours.