Power and grounding
Dedicated 20A circuit minimum, UPS on the rack sized for switch survival through utility blips (10-30 min typical), PDU at rack, and grounding bar bonded to the TBB from the MDF per TIA-607-D.

Commercial idf buildouts for Davis businesses. Licensed C-10 / C-7. Fluke-certified. Free local site survey.
Access Cabling delivers IDF Buildouts throughout Davis and the surrounding Greater Sacramento corridor — with local crews, licensed C-10 / C-7 supervision, and Fluke-certified sign-off on every commercial project. For businesses navigating the dynamic environment of Davis, robust and reliable network infrastructure isn't merely a convenience; it's a strategic imperative. As a hub of innovation and academia, anchored by the vast UC Davis campus, the commercial landscape here demands a cabling foundation that can support cutting-edge research, advanced educational technologies, and the intricate operational needs of local enterprises. IDF (intermediate distribution frame) buildouts across California — telecom closets on each floor or wing that home-run horizontal cabling for a floor plate and connect back to the MDF over the backbone. Access Cabling installs racks, patch panels, backbone terminations, PoE switching, grounding, and full documentation.
Dedicated 20A circuit minimum, UPS on the rack sized for switch survival through utility blips (10-30 min typical), PDU at rack, and grounding bar bonded to the TBB from the MDF per TIA-607-D.
Across Davis — from UC Davis to the surrounding Yolo County corridor — IT directors and facilities managers pick Access Cabling for the same reasons: a licensed C-10 / C-7 contractor (CSLB 992009), 28+ years of commercial data center experience, BICSI-trained crews on-site, and Fluke DSX certification on every port. The result is a idf buildouts install that a network engineer can drop into on day one — labeled, tested, and warranted for 25 years.
Access Cabling's strategic location allows for efficient dispatch and project management across Davis. Our teams are intimately familiar with the city's geographical layout, from the bustling campus core of UC Davis to the growing commercial zones along Mace Boulevard and the Mace Ranch development. This local knowledge translates into faster response times for urgent service calls and seamless logistical planning for larger installations. We minimize travel delays and ensure our technicians arrive equipped with the right tools and understanding of Davis-specific site conditions, whether we're upgrading networks in older downtown buildings or installing new infrastructure in rapidly developing areas like The Cannery. Our commitment to local service ensures that Davis businesses benefit from a responsive and highly-coordinated cabling partner.
OS2 single-mode fiber trunk (12-24 strand minimum), fusion-spliced to a factory pigtail in a Corning CCH or Panduit Opticom panel, terminated on LC-duplex or MTP-24. Full Tier 1 and Tier 2 certification with test report. Standard practice is 4x oversized on strand count for future growth.
Common project types we deliver near UC Davis and throughout Yolo County.
Every Davis project closes with Fluke DSX (or OTDR for fiber) certification reports for every port, a TIA-606-B labeled patch schedule, redlined as-built drawings, rack elevations, warranty registration, and a MAC-ready cabling database. Your IT team can pick it up cold on day one.
Low-voltage installation in Davis falls under California C-7 and C-10 contractor scope and, depending on scope, may require Yolo County building or electrical permits — especially for conduit rough-in, penetrations, and rated-wall firestopping. Access Cabling pulls permits when required and handles inspections directly with the AHJ.
Yes. Many of our Davis-based clients scale IDF Buildouts to additional sites across California and nationally. A single PM standardizes drawings, materials, testing thresholds, and closeout format across every location, so IT sees identical documentation whether the site is in Davis or Chicago.
Yes. Almost every Davis project we run is coordinated with a GC, architect, MEP engineer, or building management team. Our PMs attend OAC meetings, submit shop drawings and rack elevations, coordinate ceiling access windows with other trades, and honor building rules for freight elevator use, badge access, and after-hours work.
Basic IDF (one rack, backbone fiber, PoE switch, UPS): $8-20k installed. Larger IDF with multiple racks and heavy cabling: $25-50k. Excludes major electrical or cooling if required.
Yes — pull, fusion-splice, terminate, and Tier 1/Tier 2 certify. Delivered with test report and pathway documentation.
Commercial cabling projects in Davis typically require an electrical permit from the City of Davis Community Development Department. This permit covers low-voltage installations. Larger projects may also necessitate a general building permit or tenant improvement permit. We handle the process of submitting plans and securing necessary approvals, ensuring all work complies with city codes and any specific Yolo County regulations for facilities outside city limits.
28 years, thousands of sites, one accountable contractor. Get a free site survey and an itemized quote in 48 hours.