Can existing cable be reused during a Network Cabling refresh in San Jose?+
Sometimes. On San Jose refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
How long does a typical Network Cabling project take in San Jose?+
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small San Jose tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger Santa Clara County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
Do you offer manufacturer warranties on Network Cabling in San Jose?+
Yes. As a certified installer for Panduit, CommScope, Leviton, and Belden, San Jose and Silicon Valley projects can be registered for a 25-year performance and applications warranty on structured cabling components — copper and fiber, patch panels through work-area outlet. Coverage details are documented in the closeout package.
Is Network Cabling in San Jose a permitted trade under the county?+
Low-voltage installation in San Jose falls under California C-7 and C-10 contractor scope and, depending on scope, may require Santa Clara County building or electrical permits — especially for conduit rough-in, penetrations, and rated-wall firestopping. Access Cabling pulls permits when required and handles inspections directly with the AHJ.
How many drops do I need?+
Standard office: 2 per workstation (primary + spare), 1 per WAP (density around one AP per 800-1,200 sq ft of open office), 1 per wall-mounted display, 1-2 per conference table, 1 per camera, 1 per printer. Add 25-35% patch-panel spare capacity for future MACs.
What warranty applies?+
One-year workmanship from Access Cabling, plus 20- or 25-year manufacturer system warranty (Panduit or CommScope) on end-to-end certified installations.
Does Access Cabling handle prevailing wage projects for public works in San Jose?+
Yes, Access Cabling is fully qualified and experienced in managing prevailing wage projects for public works in San Jose and throughout California. We understand the specific compliance requirements for government contracts, whether for city, county, or state agencies operating within the San Jose area, ensuring all labor regulations are meticulously met.