Do you coordinate CAT7 Installation with general contractors and property managers in Burlingame?+
Yes. Almost every Burlingame project we run is coordinated with a GC, architect, MEP engineer, or building management team. Our PMs attend OAC meetings, submit shop drawings and rack elevations, coordinate ceiling access windows with other trades, and honor building rules for freight elevator use, badge access, and after-hours work.
What documentation do we get at the end of a Burlingame CAT7 Installation install?+
Every Burlingame project closes with Fluke DSX (or OTDR for fiber) certification reports for every port, a TIA-606-B labeled patch schedule, redlined as-built drawings, rack elevations, warranty registration, and a MAC-ready cabling database. Your IT team can pick it up cold on day one.
Can existing cable be reused during a CAT7 Installation refresh in Burlingame?+
Sometimes. On Burlingame refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
How long does a typical CAT7 Installation project take in Burlingame?+
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small Burlingame tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger San Mateo County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
What permitting is required for low-voltage cabling in Burlingame and who handles it?+
For commercial low-voltage cabling projects in the City of Burlingame, permits are typically handled through the Burlingame Building Division. Depending on the scope, an electrical permit covering low-voltage work may be required. Access Cabling, as a C-10/C-7 licensed contractor, takes full responsibility for identifying, preparing, and submitting all necessary permit applications to the City of Burlingame to ensure full compliance with local building codes, including any specific amendments to the California Electrical Code.