Can existing cable be reused during a Fiber Splicing refresh in Daly City?+
Sometimes. On Daly City refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
How long does a typical Fiber Splicing project take in Daly City?+
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small Daly City tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger San Mateo County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
Is Fiber Splicing in Daly City a permitted trade under the county?+
Low-voltage installation in Daly City falls under California C-7 and C-10 contractor scope and, depending on scope, may require San Mateo County building or electrical permits — especially for conduit rough-in, penetrations, and rated-wall firestopping. Access Cabling pulls permits when required and handles inspections directly with the AHJ.
Do you offer manufacturer warranties on Fiber Splicing in Daly City?+
Yes. As a certified installer for Panduit, CommScope, Leviton, and Belden, Daly City and Peninsula projects can be registered for a 25-year performance and applications warranty on structured cabling components — copper and fiber, patch panels through work-area outlet. Coverage details are documented in the closeout package.
Can you splice ribbon fiber?+
Yes — we have mass-fusion ribbon splicers (Sumitomo T-72C, Fujikura 90R) for 4/8/12-fiber ribbon common in high-count OSP and hyperscale data-center trunks. Mass fusion is 5-10x faster than single-fiber splicing on high-count cables.
Do you provide OTDR traces after splicing?+
Yes — bidirectional Tier 2 OTDR trace on every strand, plus Tier 1 end-to-end insertion loss when the full link is accessible. Delivered as .sor files and a PDF report.
Do you handle prevailing wage projects for public works in Daly City?+
Yes, Access Cabling is fully equipped and experienced in handling prevailing wage projects, including those for public works and government entities within Daly City and San Mateo County. We understand the specific requirements for such projects, including certified payroll and adherence to state and federal labor laws, ensuring compliance and successful project completion for municipal or public sector initiatives.