What documentation do we get at the end of a Inglewood Fiber Splicing install?+
Every Inglewood project closes with Fluke DSX (or OTDR for fiber) certification reports for every port, a TIA-606-B labeled patch schedule, redlined as-built drawings, rack elevations, warranty registration, and a MAC-ready cabling database. Your IT team can pick it up cold on day one.
Can existing cable be reused during a Fiber Splicing refresh in Inglewood?+
Sometimes. On Inglewood refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
Do you coordinate Fiber Splicing with general contractors and property managers in Inglewood?+
Yes. Almost every Inglewood project we run is coordinated with a GC, architect, MEP engineer, or building management team. Our PMs attend OAC meetings, submit shop drawings and rack elevations, coordinate ceiling access windows with other trades, and honor building rules for freight elevator use, badge access, and after-hours work.
Is Fiber Splicing in Inglewood a permitted trade under the county?+
Low-voltage installation in Inglewood falls under California C-7 and C-10 contractor scope and, depending on scope, may require Los Angeles County building or electrical permits — especially for conduit rough-in, penetrations, and rated-wall firestopping. Access Cabling pulls permits when required and handles inspections directly with the AHJ.
How long does it take to splice a 48-strand cable?+
Roughly 3-5 hours for a full 48-strand fusion splice job in an OSP enclosure with bidirectional OTDR verification, cleaning, and case reseal — assuming reasonable access. Ribbon cable is significantly faster.
What's the typical loss for a fusion splice?+
Under 0.05 dB for a well-executed single-mode splice with a core-alignment splicer, and typically 0.02-0.03 dB is achievable. Multimode splices run slightly higher (0.05-0.10 dB). Anything over 0.10 dB we cleave and redo.
Does Access Cabling handle prevailing wage projects for government or public works in Inglewood?+
Yes, Access Cabling is experienced and equipped to handle prevailing wage projects and public works contracts within Inglewood and throughout Los Angeles County. As a licensed C-10/C-7 contractor, we understand the specific compliance, reporting, and labor requirements associated with these types of projects, ensuring all work is performed to the highest standards and in adherence to all regulations for municipal or publicly funded initiatives in the city.