Can you handle after-hours Ubiquiti UniFi Installation in Merced to avoid business disruption?+
Absolutely. Night, weekend, and phased cutover windows are standard on Merced tenant improvements, hospital environments, retail cores, and 24-hour operations across Merced County. We run swing shifts, dark-window pulls, and cutovers scheduled around production without inflating the price.
What documentation do we get at the end of a Merced Ubiquiti UniFi Installation install?+
Every Merced project closes with Fluke DSX (or OTDR for fiber) certification reports for every port, a TIA-606-B labeled patch schedule, redlined as-built drawings, rack elevations, warranty registration, and a MAC-ready cabling database. Your IT team can pick it up cold on day one.
Can existing cable be reused during a Ubiquiti UniFi Installation refresh in Merced?+
Sometimes. On Merced refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
How long does a typical Ubiquiti UniFi Installation project take in Merced?+
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small Merced tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger Merced County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
Do you install UniFi cameras (Protect)?+
Yes — G5 Pro, G5 Bullet, G5 Turret, and G5 Dome cameras with UniFi Protect NVR or Cloud Key. Integrated with UniFi Access for door-event bookmarking.
Do I need a dedicated NVR for cameras?+
Depends on camera count and retention. Small deployments (under 10 cameras) run on a Cloud Key Gen2 Plus. Larger deployments use a Network Video Recorder (NVR Pro) with RAID storage sized to camera count and retention.
Does Access Cabling handle prevailing wage projects for public works in Merced?+
Yes, "Access Cabling is experienced and qualified to undertake prevailing wage projects for public works in Merced and Merced County. Our longstanding CSLB license (992009) and commitment to compliance mean we can effectively bid on and execute state or federally funded projects, including those for UC Merced or municipal facilities.