Can existing cable be reused during a Fusion Splicing refresh in Santa Rosa?+
Sometimes. On Santa Rosa refresh projects we Fluke-test the existing plant first: if runs pass CAT6 or CAT6A channel spec and pathways are clean, they stay. Anything failing certification, abandoned per NEC 800.25, or unlabeled gets removed and replaced. You get a channel-by-channel keep/replace decision — not a blanket rip-and-replace bill.
What documentation do we get at the end of a Santa Rosa Fusion Splicing install?+
Every Santa Rosa project closes with Fluke DSX (or OTDR for fiber) certification reports for every port, a TIA-606-B labeled patch schedule, redlined as-built drawings, rack elevations, warranty registration, and a MAC-ready cabling database. Your IT team can pick it up cold on day one.
Do you support multi-site rollouts anchored in Santa Rosa?+
Yes. Many of our Santa Rosa-based clients scale Fusion Splicing to additional sites across California and nationally. A single PM standardizes drawings, materials, testing thresholds, and closeout format across every location, so IT sees identical documentation whether the site is in Santa Rosa or Chicago.
How long does a typical Fusion Splicing project take in Santa Rosa?+
Timelines depend on drop count, pathway complexity, and after-hours restrictions. A small Santa Rosa tenant improvement of 20–40 drops usually completes in 2–5 working days. Larger Sonoma County projects with backbone fiber, MDF/IDF buildouts, and multiple floors typically run 2–6 weeks. We publish a per-phase schedule with the quote so your GC and IT team can coordinate cutover.
How is fusion splicing priced?+
Per-splice pricing on batch jobs (typically $50-$120 per splice depending on volume and access), plus a mobilization for the splicing truck. Emergency after-hours splicing is T&M at premium rates.
Can you fusion splice at height on aerial spans?+
Yes — with a bucket truck, the splicer runs from the bucket with battery power and inverter-fed heat oven. We follow all pole-attachment safety and CPUC standards on utility poles.
Does Access Cabling handle prevailing wage projects for government or public works in Santa Rosa?+
Yes, Access Cabling is experienced in handling prevailing wage projects. For government agencies, public schools, or other publicly funded entities in Santa Rosa and Sonoma County, we are fully prepared to meet all prevailing wage requirements and operate in full compliance with public works statutes for low-voltage cabling and network infrastructure installations.